[f] act 5: framing part ii

framing completed as of middle June 2008.

from driveway – halfway up


view of garage – second floor above not built out yet


view of front porch – not yet built out

back right of house – bedroom

back of house – from angle

right side of house

basement door – huge stone retaining wall

view over future railing into great room

view out second floor window


upstairs hallway over great room – halfway down near left second floor bedrooms


upstairs hallway over great room – view of back wall


view down into staircase from second floor


outside view from second floor attic room

second floor bed room number two window


second floor – bedroom number two side window

second floor bed room number three side window

down second floor hallway to bedroom number 2 and 3

second floor bathroom number 2

view from hallway into second floor living room – room not yet framed


second floor – bathroom 1 window

view out of second floor number 1 bathroom window

standing in second floor living room

Post a Comment

You must bee logged in to post a comment.